Product Detail :
|
Design, engineering, procurement, fabrication, load out, tie down / sea fastening, tow-out / sail-out, transportation, dismantling/removal and disposal of old unserviceable materials/ items, installation and as built documentations of entire facilities as described in the bidding documents for the following replacement of barge bumpers - 110 nos. at 59 platforms. replacement of boat fenders - 306 nos. at 27 platforms replacement/new riser protectors - 5 nos. replacement of boat landing cum riser protector -2 nos. replacement/new boat landings - 6 nos. jacket strengthening 3 nos. platforms removal of old riser - 1 no. removal of sump caisson and fire water pump casing 1 no. each removal of old boat landing at ne platform.
|