Product Detail :
|
Improvement of Roads in the Beed District in Maharashtra State for Two laning road/ Two Laning road with paved shoulders under MRIP package AU-123 section from Padalsingi Kukkadgaon Pimpalner Wadwani Km. 0/00 to Km. 38/400 (Total Design Length- 33.755 Kms) on Hybrid Annuity Mode (HAM).
|