Product Detail :
|
HUBBALLI DIVISION Londa-Miraj(LD-MRJ)Protection work for the bridge and bank
due to river flooding at bridge NO.86,87,88,90,91 and 34 between KM 553/400 to
557/200 and 579/200 to 579/400.(Maintenance Period12 Months)
|
Tender Detail : |
HUBBALLI DIVISION: Londa-Miraj(LD-MRJ):Protection work for the bridge and bank
due to river flooding at bridge NO.86,87,88,90,91 and 34 between KM 553/400 to
557/200 and 579/200 to 579/400.(Maintenance Period:12 Months) |