Product Detail :
|
Relocation Installation Commissioning of Existing Equipment/machines to Adjacent New Facility (q3) Removing, Shifting Constructing of Foundation, Installation, Relaying of Electrical, Lines as Applicable and Commissioning of the Following Equipment-, (i) Lathe Machines with Accessories 4 Set 4 Mtr X 1.5 Mtr 1200 Kg, (ii) Milling Machines with Accessories 2 Set 2 Mtr X 2 Mtr 1500 Kg, (iii) Boring Machine with Accessories 1 Set 2 Mtr X 2 Mtr 1200 Kg, (iv) Drilling Machine with Accessories 2 Set 1 Mtr X 1 Mtr 800 Kg, (b) Removing, Shifting, Constructing of, Foundation, Installation, Relaying of, Electrical Lines of Electroplating Tank, 1 Set Equipment Non, Operational, (c) Scrap Items Comprising of Chairs, , Racks, Pipes, Partition Boards, Basin, Stand, Tables, Etc., 1 Set 4 Mtr X 4 Mtr 2000 Kg, (d) Construction of Test Pit Secured with, Hatch at Hp Cylinder Testing Area, 2 Set 3 Mtr X 3 Mtr X, 6 Mtrs 1000 Kg, (e) Removing Shifting, Constructing of, Foundation, Installation, Relaying of, Electrical Lines of Shot Blasting, Rumbling Machine at Hp Cylinder, Testing Area, 1 Set 6 Mtr X 6 Mtr 1200 Kg, (f) Removing and Shifting of Pneumatic, Panel with Manifolds, Silencer, Etc., 1 Set 2 Mtr X 0.5 Mtr 400 Kg, (g) Supply and Installation of 25nb Hp, Line Including Pressure Gauges, Wall, Mounting Brackets, Pressure Relief, Valves, 1 Set 500 Mtr 400 Kg, 2, Sl Equipment Description Qty Uom Dimension of, Machine, Weight, (approx), (h) Shifting of Existing Hp Cylinders to, Temporary Facility, 1 Set 1 Mtr X 4 Mtr 3000 Kg, (j) Removing Shifting, Constructing of, Foundation, Installation, Relaying of, Electrical Lines of Hp Storage Cylinder, at Hp Valve Testing Area, 1 Set 8 Mtr X 8 Mtr 1000 Kg, (k) Removing and Shifting of Master, Valve Storage at Hp Valve Testing, Area, 1 Set 8 Mtr X 8 Mtr -, (l) Removing, Shifting & Installation of, Valve Testing Facility at Hp Valve, Testing Area, 1 Set 8 Mtr X 8 Mtr -, (m) Removing, Shifting & Installation of, Oven at Hp Valve Testing Area, 1 Set Equipment Nonoperational, (n) Removing, Shifting & Installation of, Ducting in Shop Floor at Hp Valve, Testing Area, 1 Set 4 Mtr X 4 Mtr 1000 Kg, (p) Removing & Shifting of Lp Cylinder at, Hp Valve Testing Area, 1 Set 4 Mtr X 4 Mtr 500 Kg, (q) Removing, Shifting & Installation of, Blower Booth at Hp Valve Testing Area, 1 Set 4 Mtr X 4 Mtr -, (r) Removing, Shifting, Constructing of, Foundation, Installation, Relaying of, Electrical Lines of Electrical Panel, Board Section, Qty 1
|